25 May 2026 Updated – Kuantan, Malaysia, Sultan Ahmad Shah (WMKD); Procedure information not current Notices & Alerts / Updated – Kuantan, Malaysia, Sultan Ahmad Shah (WMKD); Procedure information not current Included Regions (1) Pacific Basin Included Areas (1) Malaysia DAGAD, MEVOK, OBLIG, OSTIN, TAXUL & VPK 1H ARRS (10-2C) DAGAD, MEVOK, OBLIG, OSTIN, TAXUL & VPK 1J ARRS (10-2D) RNP Y Rwy 36 (12-2) All charts dated 13 FEB 26, EFF 19 Feb Procedure information not current The Jeppesen electronic chart library does not contain current information for Sultan Ahmad Shah; Kuantan, Malaysia (WMKD). Malaysia AIP AMDT 002-26 (published and effective 19 May 2026) was received after the ICAO specified date for aeronautical information publication and contains revised procedure information, which could not be incorporated in time. The following changes apply: • RNP Y Rwy 36 (12-2) o Holding at PUPEL (IAF) removed • DAGAD, MEVOK, OBLIG, OSTIN, TAXUL & VPK 1H ARRS (10-2C) ELECTRONIC DEVICES: Outdated procedures displayed: DO NOT USE o Corrected chart (10-2C, dated 13 FEB 26, EFF 19 Feb) is attached to this chart alert. Additional changes, applicable to the attached chart (10-2C, dated 13 FEB 26, EFF 19 FEB) o OSTIN, TAXUL & VPK 1H ARRS: Altitude restriction at VKN lead radial 176°/D15.0 Arc VKN to read at or above 3000 o DAGAD, MEVOK & OBLIG 1H ARRS: Altitude restriction at VKN lead radial 192°/D15.0 Arc VKN to read at or above 3000 The lead radial crossings are also applicable to the published routing box • DAGAD, MEVOK, OBLIG, OSTIN, TAXUL & VPK 1J ARRS (10-2D) ELECTRONIC DEVICES: Outdated procedures displayed: DO NOT USE o Corrected chart (10-2D, dated 13 FEB 26, EFF 19 Feb) is attached to this chart alert. Additional changes, applicable to the attached chart (10-2D, dated 13 FEB 26, EFF 19 FEB) o OSTIN, TAXUL & VPK 1J ARRS: Altitude restriction at VKN lead radial 180°/D15.0 Arc VKN to read at or above 3000 o DAGAD, MEVOK & OBLIG 1J ARRS: Altitude restriction at VKN lead radial 196°/D15.0 Arc VKN to read at or above 3000 The lead radial crossings are also applicable to the published routing box The revised procedure charts will be published in revision 5 JUN 26. The published charts (dated 5 JUN 26) are already effective. The charts will be attached to this Chart Alert and become available for download from www.jeppesen.com 29 May 2026 the latest. WE STRONGLY URGE YOU TO MAKE THIS INFORMATION AVAILABLE TO APPROPRIATE CREW MEMBERS OR CUSTOMERS IMMEDIATELY! WMKD_Chart_Alert_26_MAY_2026_2 Update WMKD Rev 13 FEB 26 EFF 19 Feb Back to All Notices & Alerts